150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported

Product Details
Customization: Available
Certification: ISO9001, Ce
Protection: Corrosion Resistance
Still deciding? Get samples of $ !
Request Sample

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2015-10-16
Management System Certification
ISO9001:2015, ISO14001:2015, IATF16949, ISO45001: 2018 certificate
  • 150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported
  • 150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported
  • 150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported
  • 150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported
  • 150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported
  • 150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported
Find Similar Products

Basic Info.

Model NO.
European Standard DC EV Charger
Installation
Vertical
Housing
Iron
Input Voltage
400V±15% VAC
Input Frequency
40-60Hz
Output Voltage
150-1000VDC
Thdi
No More Than 5%
Efficiency
Mini 95%
IP Class
IP54
Ik Class
Ik10
Communication
2g, 3G, 4G, 10/100base-T Ethernet
Transport Package
Standard Oversea Shipment Packages
Specification
150kW double connector
Trademark
HICONICS
Origin
China
HS Code
8504409999
Production Capacity
120 Set/Month

Product Description

150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported

Overview 

 
HK series charging pile is a unique model specially developed for European Market. It is designed based on DIN 70121 and totally meet European Standard. The isolated DC charging pile, which has been certificated by TUV SUD GROUP, is mainly used to supply fast charging to electric vehicles. Outdoor floormounted method adopted and with waterproof, dustproof and anti-corrosion functions, the charging pile could achieve a protection class of IP54 and its design could meet environment protection demand. The HK series charging pile has combined the charging interface, HMI, battery charger, communication, billing system functions into one integrated cabinet. With modular design concept, it has easily achieved convenient installation and commissioning and simple maintenance, etc. 
 
150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported

150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported


Program Interface

150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported
150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported

Electric Features  
 
  Item Technical Requirements Note
Input Feature AC input voltage 400±15% VAC System Input Voltage
AC Input Frequency Range 40-60Hz   
Power Factor ≥0.99 50% or higher load
AC Input Mode Three-phase Five-ware system 3P+N+PE
Output Feature Output Voltage Regulating Range 150-750VDC Could achieve continuous regulating by monitoring means
DC Output Charging Interface Refer to IEC62196-3-2011   
Stable Voltage Precision ≤±0.5% In Full Output Range
Stable Current Precision ≤0.5%
Voltage Error ≤±0.5%
Current Error ≤±1% Output DC Current≥30A
≤±0.3A Output DC Current<30A 
 
Average Flow Unbalance Degree ≤±5%   
Average Efficiency ≥95% 50% or higher load
Input Current Harmonic Wave ≤5%   
Other Feature Noise ≤65dB   
RCD Protection YES   
Power Frequency Withstand Voltage 2500V AC-3500V DC   
Insulation Resistance ≥20MΩ Test Voltage 1000V DC
IP Class IP54   
Connector Cable Length Standard Length is 5M   
Environmental Protection Meet 2011/65/EU   

Company Profile

150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported


Certificate150kw Bus Station Charging Station Chargers Ocpp 1.6j Supported
 
FAQ
 
Q1. What is your term of packing? 
A: Generally, we pack our goods in neutral brown cartons.
If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters. 


Q2. What is your term of payment? 
A: T/T 30% as deposit, and 70% before delivery.
We'll show you the photos of the products and packages before you pay the balance. 


Q3. What is your term of delivery? 
A: FOB, CFR, CIF, DDU. 

Q4. How about your delivery time? 
A: Generally, it will take 7 to 25 days after receiving your advance payment.
The specific delivery time depends on the items and the quantity of your order. 


Q5. Can you produce according to the samples? 
A: Yes, we can produce by your samples or technical drawings.
We can build the molds and fixtures. 


Q6. What is your sample policy? 
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost. 

Q7. Do you test all your goods before delivery? 
A: Yes, we have 100% test before delivery. 

Q8: How do you make our business long-term and good relationship? 
A: 1. We keep good quality and competitive price to ensure our customers benefit; 
A: 2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from. 





 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier